CyberPower PDU15SW8RNET Manual do Utilizador Página 77

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 100
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 76
PowerPanel™ Business Edition
76
z Power Off: Click Power Off and a confirmation window will appear. Pick the UPS/PDU from the list and
decide whether to perform an immediate or a sequenced power off. Click OK to begin. When the
UPS/PDU initiates a sequenced power off, computers with Agent or Client installed will initiate a
shutdown prior to the sequenced power off. An immediate power off will likely cause those lose power.
A confirmation window of a bulk power off operation
z Power On: Click Power On and a popup window appear. Pick the UPS/PDU from the list and determine
whether to perform an immediate or a sequenced power on. Click OK to begin.
Note: Some computers require manual booting when a UPS or a PDU powers on. To change this, set
the computers BIOS to boot when power is restored.
A confirmation window of a bulk power on operation
z Power Cycle: Click Power Cycle and a popup window appear. Pick the UPS/PDU from the list and
determine whether to perform an immediate or a sequenced power cycle. Click OK to begin.
Vista de página 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 99 100

Comentários a estes Manuais

Sem comentários